In this procedure it is not possible to add operations. It was possible in G4. Instead you will be referred to the Report manufacturing order procedure.
More information about comments and logs than in G4.
Actual reporting date is now logged in the manufacturing order log and can affect historical valuation of stock and WIP.
You can choose in which time unit to report (hours is selected by default).
A document tab is available in the same procedure as where you perform the reporting. The document tab opens when you save.
Transport label for rejection is also available in addition to the regular transport labels.
When the manufactured part has a serial number and material for the operation is traceable, a dialog box will be shown where you can enter which traceable material is included in each manufactured serial number. This is done to achieve individual traceability.
When reporting operations you will receive a warning if planned measuring has not been reported. This check is not made when reporting in the Recording terminal.
Instead of opening a reporting window, there are links which will take you to the Report measuring data.procedure.