Pre-calculation

The main purpose of this procedure is to perform a financial calculation of manufacturing cost, cost price and sales price for product structures. Costs consisting of material, sub-contracted work, and own work are added together to a total manufacturing cost.

The calculation model is a so-called mark-up calculation. This means that you add mark-ups based on costs to calculate cost price and sales price. You can create pre-calculations after you have created BOM and routings for the parts.

In the section Calculations under the Manufacturing tab in the System settings procedure, you find settings which affect pre-calculations.

Alloy cost

In this procedure you can also calculate and add alloy cost to calculations and look at already made calculations that have been saved. In the BOM and routing you decide which materials that are included in a part. These included materials might have alloy codes which are handled in the procedure Basic dataClosed With "basic data" we refer to the static records in a database, for example parts, customers, users, work centers, etc. – Part. Under the Purchase tab in the Part register procedure you can specify which alloy cost that should apply when purchasing the part (the material).

In this procedure you load the parts (for which you want to calculate the alloy cost) to the list. You select the rows you wish to include in the calculation run. Under the Summary tab you will see a summary of the alloy cost per part. This is possible to save.