Operation list

In this procedure you can load lists of operations from the BOM and routing. You can modify the information, such as BOM and routing times, cycle time, ineffective time, and work centers. You can only load and modify data for existing operations. All operations are loaded, regardless of any terms for alternate BOM and routing.

You can select list type and how the list is presented. Under the Selection tab you decide what should be loaded to the list.