Project follow-up

  • This procedure is new but has similar features to the Project Summary procedure in G4. It is used to make a financial follow-up of projects in lists, focusing on follow-ups of the project’s costs and income.
  • In G4 it was possible to choose three columns to show at the same time Budget, Forecast, Planned/ordered, Result, and Expected result. In G5 it is possible to configure which columns to show. By default, all departments are displayed. Furthermore, there are now no locked selection fields (this was the case in many lists in G4).
  • It is possible to print both total and detailed project reports, and via a drilldown it is possible to reach the detailed level.
  • Detailed project reports can be printed for several projects at a time.
  • When printing periodic reports it is possible to choose if date regarding reporting of manufacturing order should be based on actual date or log date.
  • Time for the most recent scheduled project calculation is shown under the Selection tab.