Project follow-up

In this procedure you can perform a financial follow-up of projects in a list. The follow-up can be displayed in different ways, for example as total per project with the ability to use the drilldown functionality to see detailed information.

In the project follow-up it is possible to decide which columns to show in the report. This apply to budget, planned/ordered, result, expected result, and forecast. You can see total and detailed cost reports and income reports. There is a list type for WIP value which in columns shows costs and income. For that list type there is also tabs with detailed information for each transaction reported on the project.

It is possible to select by for example project or cost types, regardless of which list you are using.

Regarding the periodic reports and the WIP value list type, the result can be periodically displayed, that is, selected by date (From – To).

For the list types Detailed and Total, the values are loaded based on the most recently made project calculation. In these reports you cannot select the result by date. In the Settings box you can select that a new project calculation should be performed when the list is loaded. It will then take a little longer to load the list.