Rejection list

In this procedure you can follow up on rejections that have been reported for operations and for individual material in manufacturing orders.

The Rejection list loads data from the manufacturing order log and cannot be updated. You can only see reporting items here that contain rejections. The actual date for the material's rejection is shown.

The cost calculation of operation rejections includes the order’s planned costs for the rejected quantity. This is calculated for material and operations up to and including the operation where the rejection takes place. The operation's costs are calculated as planned setup time for the operation, multiplied by the default setup cost for the work center. The staffing factor for setup cost registered for the operation can affect the cost calculation. This is determined by the system setting called Staffing affected cost factors. Furthermore, the unit cost is added as the operation's planned unit time multiplied by the default unit cost for the work center. The staffing factor for unit cost registered for the operation can affect the cost calculation. This is determined by the same system setting as for the setup cost. Unit cost and setup cost are shown together as processing cost in the list. For material and subcontract, the cost calculation is less complex. There the prices are entered directly on the operation.

You can see rejections that have been reported in one or several warehouses. You select warehouse in the toolbar of the procedure.