The Setup time – Detailed list
The list is loaded and displayed based on the selection and settings you have chosen. As in all lists in Monitor ERP, you can drag and drop in order to change the column to group by.
This list shows planned and reported setup time, and efficiency factor (E-factor) for the setup time. The list is grouped by work center or by actual finish date.
At the bottom you see a total of quantity, times, and E-factor.