Material list

In this procedure you can create material lists from the BOM and routing structure. Here you can for example modify planned material consumption and it is also possible to change material. You can only load and modify data for existing material. You determine whether or not the list should be possible to update by using the button in the toolbar. All the material is loaded, regardless of any terms for alternate BOM and routing.

You can select list type and how the list is presented. In the selection and under the settings, you select which parts you wish to show.